Raise the flood defence height at Snape Maltings from 3m to 3.7m. The total project cost is £500,000 and is expected to be completed by March 2020.
Activities:
December 2020: Construction starts
- The installation of concrete walls, raised earth banking and the replacement of existing windows with flood-proof windows.